![]() |
||||||||||||||
|
Specializing in comprehensive security system design and support services for over 30 years. |
||||||||||||||
|
Testing can be accomplished at various points throughout the design process. Testing can be used to prove non-standard design or operational requirements; to verify product reliability; to ensure that proposed products have the functionality and operability required in the bid documents; and to verify that the system as installed meets the requirements of the design and the needs of the facility and organization. Testing programs include:
To ensure the success of the various test programs, test procedures detailing step-by-step actions and expected results should be prepared. Test results should be documented in an orderly manner to facilitate future use of the data.
|
|||||||||||||
|
Telephone: 610-328-4130 | Pager: 800.803.0432 Facsimile: 610-328-4136 | E-Mail: LTDINCNET@aol.com |
||||||||||||||